Melbourne Laggers supplies and installs residential acoustic pipe lagging for new homes and renovations across Melbourne. We wrap sewer and waste pipes and internal stormwater downpipes to reduce noise from water moving through the pipes.

Request a quote with your suburb, plans or site photos, and the date plasterboard is due to go up.

Contact Melbourne Laggers before plasterboard is installed. Acoustic pipe lagging must be fitted after the plumbing rough-in and before the walls and ceilings are lined, while the pipework is accessible.

We supply and install acoustic lagging on accessible waste pipes and internal stormwater downpipes in new homes and renovations. The photos below show what wrapped pipework looks like while the ceiling is still open and a home at the construction stage.

Foil-wrapped pipe runs between timber joists before plastering
Pipe lagging installed before plastering
Scaffolded residential building under construction
Residential construction site

Residential project example

These pre-plaster photos show foil-wrapped pipe runs between timber joists while the ceiling cavity is still accessible.

24-hour quote turnaround. Send your suburb, plans or photos and the scheduled plasterboard date. Short-notice bookings depend on crew availability.

Read our guide to soundproofing sewer and stormwater pipes before plastering.