Bathroom Pipe Soundproofing
If you can hear the upstairs toilet flush downstairs, check the toilet waste stack and the horizontal drainage pipes in the ceiling below. Acoustic pipe lagging can reduce the noise these pipes radiate into nearby rooms. In a new build or renovation, fit the lagging after the plumber installs the waste pipes and before the builder puts up plasterboard.
Which pipes should you soundproof to reduce upstairs toilet noise?
In double-storey homes, townhouses and commercial amenities, start with the pipes closest to bedrooms, living rooms and workspaces. That often means the toilet soil stack, shower and basin waste pipes, and horizontal drainage runs in the ceiling below. Bends, junctions and accessible traps should be considered when planning the wrap so the treatment covers the relevant pipe runs.
How much noise can acoustic pipe lagging reduce?
Melbourne Laggers uses Pyrotek Soundlag 4525C. In laboratory testing, a single layer around a 100 mm PVC pipe achieved 25 dB(A) of insertion loss. That measures how much less noise the wrapped pipe emitted under the test conditions. The reduction you hear in a finished room depends on the pipe layout, fittings, supports and surrounding wall or ceiling construction.
Read the Pyrotek Soundlag technical data sheet.
Install the lagging before plasterboard goes up
Melbourne Laggers installs bathroom pipe soundproofing during construction, after your plumber fits the drainage pipes and before your builder lines the walls and ceilings with plasterboard. Book it while the pipes and fittings are still accessible.
Don’t assume your builder includes acoustic treatment for all upstairs bathroom and toilet pipes as standard. Ask which toilet stacks, shower drains and waste pipes above living rooms or bedrooms are covered in your written inclusions. If those pipes are outside the scope, contact us before plasterboard goes up.
Request a bathroom pipe soundproofing quote
Planning your build? Read what to check with your builder before plasterboard goes up.
Building a two-storey home in Melbourne? Send us your plans, site suburb and expected plasterboard date. We can help identify which upstairs bathroom pipes to treat and quote supply and installation.